Placement Locations
Typical Home Unit
Typical Commercial Unit
WARNING: FOR SAFETY DO NOT PLUG IN THE UVC MAX 25 UNTIL THE UNIT HAS BEEN COMPLETELY INSTALLED.
How to Install in a Duct Board System
When the proper location for the UVC MAX 25 has been selected, use the duct board mounting plate (5”x7” overall) to draw lines where the duct board must be cut 3” wide by 4 1/4” tall.
Cut the rectangular hole and remove the loose piece of duct board or aluminum duct.
Front view and side view of hole.
Place the mounting plate over the access hole.
Bend the mounting plate 90 degrees at the first score point. Do the same for the bottom score point.
Bend the mounting plate 90 degrees at the second score point. Do the same for the bottom second score point.
Insert to UVC MAX 25 into the mounting plate access.
Insert the 4 screws provided into the mounting plate corner holes and screw tightly.
How to Install in an Aluminum Duct
Front and side views.
Place screws and drive screws into aluminum.